TECH-VER (2019)
Checklist to verify the technical implementation of a model, from inputs to uncertainty analyses.
Contact
An independent, cell-by-cell verification of your cost-effectiveness or budget impact model, read the way an HTA assessor reads it. You receive an anomaly log, a report and a walkthrough.
A cost-effectiveness or budget impact model can contain errors that nobody notices until an HTA assessor asks a question. Each question costs time, and some delay access.
I verify the model independently, from inputs to outputs, before submission. I read it the way an assessor will.
I work with HEOR consultancies that want an independent check on a model they built, and with manufacturers preparing a submission.
An NDA can be signed before any file is shared.
The check follows published references. The Philips checklist (2006) and the ISPOR-SMDM good practices complement them where relevant. The full list is in the frameworks section of the home page.
Checklist to verify the technical implementation of a model, from inputs to uncertainty analyses.
Tool to document and assess how well a health economic model has been validated.
Checklist to report health economic evaluations clearly and completely.
Model, data, deadline. Clear scope and quote.
The model is checked against TECH-VER and AdViSHE.
Every finding is logged. A CHEERS 2022 report is prepared.
A call to go through the findings and the corrections.
90 euros per hour, for ad hoc checks and ongoing projects.
A fixed fee per deliverable, quoted after the scoping call.
An independent verification that a model is correctly implemented and documented: inputs, formulas, structure, sensitivity analyses and outputs. It is also called model verification or technical validation, and it is done before the model goes to an HTA body.
Ideally before the dossier is submitted, once the model is stable and the report is drafted. A check on the final version avoids technical questions from the assessor.
TECH-VER for technical verification, AdViSHE for the documentation of validation, and CHEERS 2022 for reporting. The Philips checklist and the ISPOR-SMDM good practices complement them.
Cost-effectiveness and budget impact models prepared for HTA submissions. The platform and the size of the model are discussed during the scoping call.
Yes. I work alongside your modellers and project leads, on the parts that you assign, and an NDA can be signed upfront.
90 euros per hour, or a fixed fee per deliverable quoted after a scoping call.
A 30-minute call, at a time that suits you. Prefer 15 minutes or 1 hour?